This was a major down to the studs kitchen renovation. This project involved major systems upgrades, the addition of a new patio door, and removal of a chimney and load bearing wall which required patching the original box beam ceiling details. A servant’s stair was removed to make room for a larger kitchen and the basement stairs were relocated. A powder room was also added to the main floor. We worked with Lucy Johnson for the design.
After