Kitchen Remodels

Fremont Kitchen

This was a major down to the studs kitchen renovation.

This project involved major systems upgrades, the addition of a new patio door, and removal of a chimney and load bearing wall which required patching the original box beam ceiling details. 

A servant’s stair was removed to make room for a larger kitchen and the basement stairs were relocated.  A powder room was also added to the main floor.  We worked with Lucy Johnson for the design.

BEFORE

AFTER

More Projects